how to electronic energy metter failed in electomagnectic
fild passing in the metter and which thing to defect more
on metter.



how to electronic energy metter failed in electomagnectic fild passing in the metter and which thi..

Answer / Ashutosh Kumar Jatav

An electronic energy meter failure in the electromagnetic field can be due to several factors such as improper grounding, faulty calibration, magnetic interference from other devices, or damage to the sensor. The most common defects might include issues with the current transformer, voltage transformer, or communication module.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Plz tell me how we can find that particular company has vacancy or not

1 Answers   L&T,


How Size of Busbar is determined for a particular load.

2 Answers  


We have a 33/11kv switchyard having 12.5 MVA power transformer. We export & import power through this transformer. When we export power, the PF will be depend on GRID PF & when we import power the PF will be depend on our load PF. but the problem is that,when neither we export nor import but our 33KV vCB is in close position,our meter read the power factor 0.14 to 0.25 at that moment. So how can be we improve the power factor at that moment.

3 Answers  


PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com

0 Answers   NHPC,


What is a differential amplifier?

1 Answers  


How to calculate the Short Circuit Impedance in Transformer?

3 Answers  


Size of the power cable like 1.5,2.5,4 sq.mm which area calculated from whick area or how specified the size?

1 Answers   MRF,


which of the following loss varies with the load a)hystresis loss b)eddy current loss c)copper loss d)core loss

2 Answers  


From the point of view of accuracy in the Measurement of Electrical energy should we select a potential transformer or a capacitor voltage transformers?.Kindly support your reply with reason and justification.

1 Answers  


Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?

1 Answers  


cable armor

3 Answers  


Here iam a question with SYNCHRONIZATION PANNEL related issue, as i want to design a SYNC.pannel board iam giving the 2 nos of 1MVA Generators to sync pannel , then what wil be the out put of the sync pannel, whether it wil be one cable coems from the sync panel or two cables.. as iam using two transformers to meet my load demand, so pls clear me whether two cables comes from sync panel to connect to transformers or only one cable

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)