EARTHING IS REQUIRED FOR HUMAN AS WELL AS MACHINE SAFTY
WHEN EVER THE LEAKAGE CURRENT FLOW IN THE CIRCUIT .IT PASS
THROUGH THE EARTHING CIRCUIT AND MAKE THE POTENTIONAL
DIFFRANCE ZERO .FOR THIS EARTHIN RESISTANCE IS GOOD AS
LESS AS. APROXIMAT 1 OHM. IS GOOD.
| Is This Answer Correct ? | 16 Yes | 1 No |
Answer / sangram
earthing is required for machine safety and very important
for human safetywhen leakage current flow should be pass by
earthing.so not danger for anything.any equpment,machine
any electrical equpment must be provied eathing.without
earthing this is not safe.
| Is This Answer Correct ? | 1 Yes | 3 No |
on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
Hi All, I am working as a Technical executive in a MNC company and we have 1500KVA & 1250KVA T/F in our site, can you help me that how many maintenance tests can be conducted and what are the procedures included for the tests can you share yours answers and also give any web address to get more information on this
lamination figures
If we increases the %impedance of Transformer then price of Transformer will increases or decreases.
What is ELCB?
Can I use measuring current transformers in protection purposes?
What is the Impedance, inductive reactance calculations
can you explain the rms value in simple words....
How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?
what is difference between single phase and three phase.
from where the self excitrd induction generator get the power?why is the voltage regulation is poor of seig?
A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)