Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What should be percentage of silt content in sand?

Answers were Sorted based on User's Feedback



What should be percentage of silt content in sand?..

Answer / amreesh

For River sand = 3% max.
for Manufactured sand = 15% max.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what is bending moment, for simply supported slab ? how do you calculate ?

4 Answers  


How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?

1 Answers  


to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash

3 Answers   Omaxe,


why we are doing post tensioning in beams and slabs. it is economical compare to rcc? how?

4 Answers  


how to design mix ratio for concrete using M25?

1 Answers  


what u mean by M20

9 Answers   Srinidhi Constructions,


A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?

6 Answers  


How many bricks will be fit in one cubic meter, if the brick measurement is 0.20cm X0.08, If you also write down the formula for this question too.

3 Answers   Vardhman,


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

1 Answers   NMN,


what is mean by short coloumn? it is depend on the height? or dia of coloumn.?

8 Answers  


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


2. What are the advantages of your present job, things you like about it?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)