If drainage is main things then which respect the super
Elevation may be provided?
Answer Posted / romy som
INNER EDGE.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the types of surveying?which type of survey carrying for type of work?
How to make tiles floor step by step procedure?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
What are segregation and bleeding?
how to tie 10 legged stirrups
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Define What is rigging?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
rate analysis for cement pointing 1:4 , for 100 sq m
Material calculation of cm 1:6 for 1sqm
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is Density of cement, sand & aggregate ?
what is high type road and low type roads
Slab quantity