To selecting rating of tr considering 3 points

1) connected load
2) Power factor
3) Future expansion

KW=KVA*PF

Is This Answer Correct ?    11 Yes 0 No

how rating of transformer is selected for any new plant/what kind of load is cosidered/what kind o..

Answer / rajeshsan

The rating of Transformer is sized based on many factors:-

1. Total load demand
2. Design margin
3. Continuous load with certain margin with intermediate load
4. In case of Thermal Power plant, Factors like Worst coal, Test block condition for Worst coal..

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what is the diffrence between R Y B phase and why it is called RYB

5 Answers  


WHAT IS MEANING OF Gg & Gg IN hrc FUSE

1 Answers  


why voltage swells and dips in transmission line?

2 Answers  


IN 3 phase induction motor where we give i/p supply & how its working ?

2 Answers  


What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?

1 Answers  


What is the function of a neutral reactor.

1 Answers  


define electrical field?

6 Answers   L&T,


Which cable is use for rtcc control panel

1 Answers  


I AM FROM ELECTRICAL ENGINEERING ? I AM ASPIRING FOR "BHEL".HOW I HAVE TO PREPARE .ON WHICH TOPICS TO BE CONCENTRATE MORE.PLEASE GIVE FULL DETAILS OF WRITTEN EXAM.

1 Answers   Bhel,


what will be the motor terminal box connection arrangement (star or delta). on what basis it decided?

3 Answers  


what is the need of capacitor in transmission lines?and how it works.

2 Answers   SCCL,


What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)