how rating of transformer is selected for any new
plant/what kind of load is cosidered/what kind of fadtors
are considered/ pz give standard procedure
Answer Posted / rajeshsan
The rating of Transformer is sized based on many factors:-
1. Total load demand
2. Design margin
3. Continuous load with certain margin with intermediate load
4. In case of Thermal Power plant, Factors like Worst coal, Test block condition for Worst coal..
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is mean 2XWY
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
What are two contours of nichols chart?
What do you mean by ratio correction factor of instrument transformer?
explain PV modules in solar energy generation.
Which power will flow first if we switch on a motor Active or Reactive? How?
Is there a diode made that works with AC 120 volt 20 amp? If so can it completely stop all current flow in 1 direction at all times?
What are the parts in a inverter?
why fractional pitch winding generally used in alternators?
Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?
why we are not giving the zone 1 trip command to the master trip relay
What is the different between digital phase converter and ordinary phase converter?
sir i completed apprentice in TNEB.apprentice is eligible for 'c' licence
While testing a ZCT what parameters have to check or measure?
can i able to get bhel previous exam question paper?