what is b checks and m checks in diesel generator
maintenance?
Answer / sk ajamat ali
A-Check (Daily routein Check)
1. Check oil level.
2. Check cleanliness of DG
3. Check Battery Voltage
4. Check any Leakage
5. Check all filter condition
6. Check oil Level
7. Check coolent Level
8. Check Check V-Belt condition
B-Check (Every 300- 350 Hrs.)
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
C-Check (Every 800-1500 Hrs.)
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level
D-check (Every 3000- 5000 Hrs.)
1. Complete DG set should be dismental.
2. Turbo charger service
3. Injector Pin service
4. Cylinder Head service
5. PT Pump sevice &
6. Repeat same B-Check process.
If your DG set running hours more than 10,000 then in D-
Check You should need to be
1. Change Piston Bearing,
2. Change nozels,
3. Piston Cylinder also need to be change.
4. Change Canopy filter if require
5. Check polution level
| Is This Answer Correct ? | 1 Yes | 0 No |
How can i learn to programme every VFD. Or is there any typical study to understand VFD programming.
thermal power station operation in general
11 Answers AJ Square Inc, Jindal, NTPC,
how to calculate the cable size depending on the transformer rating
what is the type of starter used in tube light?
why receiving end voltage increases in a system when capacitive load is added
HOW TO CALCULATE AMPs OF CURRENT TRANSFORMER IN HT Panel
How to measure current and voltage in an ELV circuit
If the rated speed of a d.c. Shunt motor is1440 r.p.m, which method of speed control would you suggested to obtain a speed of 1500 r.p.m?
how can we say that stator magnetic field rotates with synchronous speed?can we derive?
A TRANSFORMER 440/400V,DELTA/STAR CONNECTED.THE NEUTRAL CONNECTED WITH GROUND CABLE THAT IS DIRECTLY CONNECTED TO THE PANEL,FROM PANEL IT IS CONNECTED EARTH PIT.IS IT RIGHT? IF IT IS RIGHT LEAKAGE CURRENT AFFECTED.SECONDATY IS PROTECTED WITH EARTH LEAKAGE RELAY.
in which base we defined the conductor is Dog type, Squirrel type, rabbit type, wolf type etc used in transmission line?
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)