Concrete Mix designs for M15,M20,M25,M30 and M35
Answers were Sorted based on User's Feedback
Answer / qs. patrick
m15 = 1:3:6
m20 = 1:2:4
m25 = 1:1.5:3
m30 = 1:1:2
m35 = 1:0.5:1
Is This Answer Correct ? | 4 Yes | 7 No |
Answer / navin morwal
M-15 = 3.5 N/MM2, M-25 and M-20 = 4 N/MM2, M-30 and M-35
=5NMM2 THANKS.
Is This Answer Correct ? | 67 Yes | 103 No |
Answer / charan
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
M30=1:1:2
M35=1:5::10
Is This Answer Correct ? | 67 Yes | 109 No |
Explain major differences between routing maintenance and major maintenance.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What is the substitute of Mastic Asphalt?
sir, i used 43grade opc cement to my wall plastering,i have cured 20 days ,recently , white dots and white powder shades are appearing on walls, is it any defect by curing excess days? have any disadvantages by it ? please answer
how to find the carpenter work per day? how many cubic feet they should be work per day?
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
the capacity of a storage resevoir can be decided by using
what is the lap length for pile reinforcement cage in water piling
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
what is the difference between compaction and consolidation?
what is meant by residual strain?