Concrete Mix designs for M15,M20,M25,M30 and M35
Answer Posted / charan
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
M30=1:1:2
M35=1:5::10
| Is This Answer Correct ? | 67 Yes | 109 No |
Post New Answer View All Answers
How to calculate laplength for 3 floors
Explain what are the phases inspections are done by local authority while construction?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
why development length = 50D . why not 100D
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
how lap length is increased with increase of Grade of steel?
What is factor not to be taken in consideration in mix design?
Define What is the distance between railway tracks?
How to check slab shuttering level.? Or check list for slab ?
In the roof of a pumping station explain briefly the components of a waterproofing system?
Please tell me vasthu room sizes. Thanks.
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Minimum and maximum size of the building components