Civil Engineering Interview Questions
Questions Answers Views Company eMail

What is lever arm distance

1 14503

At which temperature in deg Celsius Asphalt is used for the pavement of Roads?

2 3691

What is the spacing of chairs in reinforcement steel.If it is written in IS 456:2000 then tell me the page number.

2 4765




y we need to take 28 days strength as compressive strength ? y cant we take 30 th day

2 4831

WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?

L&T,

2 8633

component parts of a weir

Infosys, L&T, Zamil Steel,

4 15098

Dear I would like discuss in deep beams problem in design and serviceability. please contribute to prepare a comprehensive discussion. first deep beam definition:

1 2543

Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?

9 11448




Why alternate bars are given bent-up in slab and how to decide the length of bent up?

4 20879

Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.

1 5445

what is super elevation?

CCCL, KMC,

10 7893

how the load will be transfer from pile foundation to soil?

CCCL,

1 5565

what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

1 3168

WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?

1 3218

How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?

Simplex, JP Group, Boss Global, Kerakoll, NextGen,

15 182481


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how can we calculate steel value, depending on load

928


what is the calculation of raw material for 0.35cum of m-15

161


Why do you want to work here

994


How to do base isolation for RC framed structure using ETABS software?

2827


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

1690






Civil engineering related

694


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

428


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

946


i need gate exam civil engineering question papers with answers

961


what is the steel difference between np-2 and np-3 pipes and weight also

922


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

8845


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

831


Which stone is best for wall construction Laterite Stone or Cement Blocks

509


what is smart building materials?

782


Engineering method, why need is column kiker??? what is necessity??

616