hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
2069Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
4619whether earth to the height of 80cm could be filled in the basement inm place of jamuna sand
L&T,
5 9400How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC
2 4441Post New Civil Engineering Questions
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
door and window wood work calculations and different methods
Are you ready to relocate with your immediate family to United States as a new employee?
Explain what is change order request?
which formula used for calculate the area of segmental arch?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Slab quantity
What is the standard volume of pharma in cub ft
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Please tell me vasthu room sizes. Thanks.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Which is the best book for building construction?
how to calculate spacing rod in column
any book or article on pumped concrete.