Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is c&c++?

IBM,

963

how to calculate the volume of water in the water tank (5'x5'x5')? what"s the formula?

MAHINDRA, New Star Construction, Shankar Electricals, Fire Safety,

15 245009

what does a civil engineer should know?

DLF,

11 25675




Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned

Bestech,

3 14146

Where hinge support is used in residential building?

2 6436

M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?

IVRCL,

9 16860

what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?

Ashok Leyland, Marathon Realty,

3 9278

how many nos of National highway in India.

L&T, HBC,

13 22968




Geometric Design Related Code name in India.

L&T,

1 4565

What is PQC. Means PQC

L&T, Era Infra Engineering,

14 93339

what is DLC

L&T, PQC,

7 31211

Rigid pavement Load in tyre preesure It Means KG

L&T, DNB,

2 4243

Pls provide me with the calculation or codes related to de- shuttering of flat slabs

2 4473

what is the weight of 8mm dia steel with 1 meter length. Is there any formula to calculate the weight for any given diameter

TNS, L&T, SODI, Shell, D M Systems, OL, PWD, Spyro Engineers, SMB, Welspun, Benny Industries, MYC Infra,

48 294822

what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption?

ACIL, Punj Lloyd Ltd, L&T, Rajshree Construction,

2 8064


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

1323


what is SDLC ?and write a 'c'program for to swapping the three numbers?

580


How to calculate construction cost of residential building in mumbai

532


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

1379


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

783






From where the relationship of target strength comes in mix design(graph)

921


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

707


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

686


IS code for grade of concrete for bamboo lintel????

842


how many types of survey and what are levelling instrument?

772


types of survey and levelling instrument ?

481


.5Ast

440


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

198


Calculation of Pier Cap with tapper area?

2963


what is that one cub metre plaster in cemant and fine sand

642