I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
1 3640Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk
2 4538The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
1 3124For 100 cu.m of solid block masonry in CM 1:6, 8" thick. Calculate no of blocks required...? Actually I got it as 1250 no's.. But in my material it is 1100 no's.. U guys plszz check & tell me the answer......
1 3564How to fix steel in rectangular footins? I.e first along the length or first along the width??
1 3554During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
ABC,
5 6100Post New Civil Engineering Questions
Which are the Steel tests ?
how water proof chemicals act in concrete to avoid leek?
length where bent up is made in slab of bridge from one end
What are the phases inspections are done by local authority while construction?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
I need model question papers for writing the Dubai municipality exam,for G+1
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the effect of duration of earth quake on framed structures ?
how to remove the quantity of metal 1 and metal 2 in concrete
roll of DLC in road constructions
In reclamation works what are the importance of geotextiles and sand?
what is mc arther pile?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.