I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
1 2472Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk
2 3490The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
1 2286For 100 cu.m of solid block masonry in CM 1:6, 8" thick. Calculate no of blocks required...? Actually I got it as 1250 no's.. But in my material it is 1100 no's.. U guys plszz check & tell me the answer......
1 2806How to fix steel in rectangular footins? I.e first along the length or first along the width??
1 2737During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
ABC,
5 4397Post New Civil Engineering Questions
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
what"s the sort of beams?
How many days should curing of plastering, brick work and concrete
what is stressing
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
what is conrete grade ,how are depent on concrete grad and size of concrete?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
Doul Bar reinforcement and details of drawing.
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is the zero value in quantity surveying
I have an span length 16 ft c/c
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is rolling stock