I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
Answer / sandeep bhardwaj
cost is thirty laks per floor if piling is used with finishing
| Is This Answer Correct ? | 0 Yes | 0 No |
How many nos. are Contains fly ash Brick in one Cubic meter ?
what is the real de-shuttering time for rcc column,slaband wall
How many kilo-newtons equals 1000 kilogram?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate
How many BRICKS required for 10 cumic of brickwork
From where the relationship of target strength comes in mix design(graph)
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
How to calculate unit weight of concrete for m40 grade.
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)