How to calculate quantity of plum masonry in 1:3:7

1654

what is mean by "SQP"

1 4295

how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation

DLF, Sobha Developers,

5 46601




how many cubic feet in one unit of sand?

L&T, Ratna Infrastructure Projects, PSPCL,

16 151608

wat is fe full form in fe4l5?

7 17159

Why we use Reinforcement out side of the column not in centre

4 6483

How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?

CCCL,

1 6014

relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

Infosys, SSC,

1 5348




Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.

1 3010

Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

1204

Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..

1 2147

Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.

3 3222

What is the Steel bar spacing formula for Concrete Slab?

B L Kashyap,

4 54434

HOW MUCH SNOWCEM REQUIRED PER SQ. METER AREA

Bhushan Power Steel,

2 7773

what is FPS brick

2 12068


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Can we use the flyash bricks in brick bat coba?

284


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

1026


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

1338


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

1285


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

343






What is the significance of cost estimate knowledge for an architect?

430


what are the forces acting on gantry girder

2421


types of piles detail,

1128


"Gates of the dams are generally designed of curved shape". Why?

780


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

916


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

1622


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

346


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

756


how can we calculate steel value, depending on load

1012