how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 84462How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?
CCCL,
1 8142relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
1 10362Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.
1 4880Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
3533Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..
1 4078Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.
3 6418Post New Civil Engineering Questions
Explain moment of inertia?
What are the responsibilities of a site manager?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
is basic cost of the material includes tax?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What will you do if you encounter problems like accidents?
What is structural frames or systems?
How many days should curing of plastering, brick work and concrete
Explain what is structural frames or systems?
What Are The Steps Involved In The Concreting Process, Explain?
How to do base isolation for RC framed structure using ETABS software?
Which are the Steel tests ?
what is mean by reestimation?
Mention what are the composition of a landfill?
What is alternate bid?