per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
2628How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
7 16994How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step
Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,
31 313880what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
2338What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
gdcl,
2246Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
2383Post New Civil Engineering Questions
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
How to calculate plastering for elevated water storage tank
How did the romans get water up hills using aqua ducts?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
Did any of the egyptian pyramids ever fall down?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
what is idealized curve for concrere and steel
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the ingredient value of 40mm and 20mm aggregates?
What are the different softwares used for cad?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
in design case of structural member best suitrable percentage of steel limit is what
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?