Engineering Interview Questions
Questions Answers Views Company eMail

How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".

7 15927

What is Automatic interlocking circuit dighram between two contactor for DG SET panel.

1 4155

When motor stater and roter air gap do big then what will moter.

Intas,

3 5442

Impedance relay is directional relay or non directional relay?

KSEB, NTDC,

2 7428

What is difference between Electrical & Electronic Device? 

AZ Engineering, Vodafone,

7 11683

Explain and give examples about VCB?

AZ Engineering, Vodafone,

2899

what is transient earth voltage

2 6163

what are the difference between grounding,earthing and neutral???????....

1 2749

In Australia what is minimum qualifications if the ship has two Main Engines each engine is 2400HP and each engine has its own shaft and propeller. Rgds_____Robert

2093

How can be calculate discharge of id fan. impeller dia-800 mm,motor capacity 10 hp 2800 rpm,blower opening section 230*130 mm

3328

how tto ingress mw in turbine explain.procedure ?

Power Grid,

1751

How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer

1 3482

what does mean ct knee voltage and burden 

1 3393

How can calculate cement quantity in brick work

2 12051

In three phase, phase to phase voltage is 440 Volts, but the three phase motors are designed for 415 Volt, 50 hz, why

Shree Ram, Shriram, Sri Ram,

1 4972


Un-Answered Questions { Engineering }

how to check and keep control on the wastage of material at site

1864


If a dimension is given as SC parameter, is supplier allowed to use full range of tolerance specified in drawing without proving capability?

1188


What is Kirchhoff's Law ?

598


Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me

1527


Explain the role of ISO in quality assurance.

5






high voltage transformer input voltage,current and amps rating..distributed transformer input voltage,current and amps rating...

1544


Is there a quick rule-of-thumb to estimate a gas side heat-transfer rate inside the tubes of a shell and tube heat exchanger?

664


What is the difference between PLC and DDC?

1680


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

5736


Explain how many mosfet switches are there in dynamic ram?

576


What is the difference between isolators and electrical circuit breakers?

631


WHAT IS THE TOTAL HEAT RATE OF PLANT AND WHAT IS THE HEAT RATE OF BOILER?

1687


What is a signal flow graph?

647


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1387


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

1676