In Australia what is minimum qualifications if the ship has two Main Engines each engine is 2400HP and each engine has its own shaft and propeller. Rgds_____Robert
2093How can be calculate discharge of id fan. impeller dia-800 mm,motor capacity 10 hp 2800 rpm,blower opening section 230*130 mm
3328How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer
1 3482In three phase, phase to phase voltage is 440 Volts, but the three phase motors are designed for 415 Volt, 50 hz, why
1 4972
how to check and keep control on the wastage of material at site
If a dimension is given as SC parameter, is supplier allowed to use full range of tolerance specified in drawing without proving capability?
What is Kirchhoff's Law ?
Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me
Explain the role of ISO in quality assurance.
high voltage transformer input voltage,current and amps rating..distributed transformer input voltage,current and amps rating...
Is there a quick rule-of-thumb to estimate a gas side heat-transfer rate inside the tubes of a shell and tube heat exchanger?
What is the difference between PLC and DDC?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
Explain how many mosfet switches are there in dynamic ram?
What is the difference between isolators and electrical circuit breakers?
WHAT IS THE TOTAL HEAT RATE OF PLANT AND WHAT IS THE HEAT RATE OF BOILER?
What is a signal flow graph?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,