Engineering AllOther (1379) How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
2 10467What is the maximum current carrying capacity for both copper and aluminium cables for 1sqmm?
2 4748
What is resistance reading of earth copper rod with grid and without grid?
I want to get or know the interview questions often ETOs are asked .
What is the purpose of capacitor? What does capacitor load means? How does it connect?
dear sir i m anshul kumar from dehradun i want to last five year railway chandigarh and allahabd entrance exam papers pls send it on my id my id is anshuldhiman83@gmail.com or anshuldhiman@rediffmail.com i shall be very greatful to u thank u
Name the four most important components of a Freon refrigeration system.
Can you help me to explain briefly the function of Op-Amp in circuit design.tq
can I improve the furnace power factor (10 mva transformer) by adding a capacitor bank before the transformer.Does system power factor vary a lot with the furnace PF?
Define the function of hydro extractor machine?
What you mean by operator skills?
define hysteresis loss, eddy current loss and windage loss
Why would you use hydraulics rather than pneumatics?
what is smartµ grid technology?under coal gassification?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
What is the formula for 1 HP of a two-cycle engine?
Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere