57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
L&T,
9042( Re: WHAT SHOULD BE THE RATING OF MCCB FOR 415V,3Ph,50KVAR CAPACITOR BANK Answer # 1 The capacitor current would be kvar x 1000 / (415 x sqrt3). This would be 70a approx. The MCCB selected should have *atleast 1.4 times this current i.e. 1.4 x 70= 98. So you should choose at least 100 A mccb.) regarding to this answer,i would like to know why the current have to times 1.4 to get the right amphere for the mccb.hows the formula to get the 1.4??tq
2 11043What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?
ABC Enterprise, Alstom, Badri Rai, IOCL, L&T, MICCO, NKC, PDC Construction,
8 74845Shall I use 40A semiconductor Fuses in 32 A SFU ? Frame size is same. What Happen if Fuses burn on SFU?
1612hi i am an CSE engg student and i cleared the PE exam of BEL 2012 both 24/07/012 and 01/08/2012 , so please if someone can help me with PE Interview question or subject or topics which i should cover that help me clear both Interview.PLZ help. my mail id is rjjkumar99@gmail.com
BEL,
1657i want to know what r the various job in government as well as central government, for mechanical engineers. can any one answer plz
1512name the type of AM used in TV picture transmission and why is it used ? draw the frequency domain spectrum of the TV signal
1 5338
Explain what are the factors which the measurement accuracy of q-meter?
What are the frequently asked technical engineer ques?
How is PH sensor works ?
What is difference between code and standard and specification?
How to test the GSM, CDMA wireless terminals?
how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?
What is bearing and what are the different types of bearing ?
List out some of the checking’s, done at the completion of construction?
pls tell me the process to set up a power plant right from the permission from state govt ????
Hi Friends, I am preparing for Airport authority of India ,so please forward me question papers and questions that are generally asked in test. my email ID is :jitinkumar_micro@rediffmail.com
Briefing the effects of ASR and ACR of a double closed-loop speed regulating system.
What are the principles of quality control?
how to generate linked implementation of sparse matrix?
How to Calculate The sag of OPGW in Transmission Line???
WRITEDOWN FEW RELY CODES