Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

how to calculate when (-) sign givcn in the power number for example 125^-5

1 3173

What are the functions of temperature scanner in power transformer?

HCL,

2188

What are the difference between off-load tap changer and on-load tap changer in transformer?

HCL,

2 18350

What is Annunciation?

Solare,

2035

what are the functions of current transducer and voltage transducer?

MEL,

1 4132

Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

2 6462

what is test initiation criteria in software testing

CybAge, Seed Infotech,

2 7559

What percentage netural current is in netural depend upon the phase current

1 3393

in cable joints procedure what electrical problems have been solved out ?

1 3659

which bridge is used to measure frequency?

2 5008

Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

Saudi Ceramics,

1810

What is the difference between Maintenance Order and Production Order. the point is i want to know the affection of Movement type 261 thru maintenance order and Production order. if i change any settings for Maintenance order it will affect to production order process also for 261 movement type ?

Saudi Ceramics,

2483

what is the 2MVA distribution transformer efficiency

1 3953

What is the amount on nails per bag needed for 1m square of wooden form work?

Ansal Housing, College School Exams Tests,

2 6278

i have to use generator in my project,which gen. i can use?

1 3261


Un-Answered Questions { Engineering }

Which tank weighing system is better to install (Accuracy point of view) 1) Tank weighing system with 3 load cell or 2) Tank weighing system with 4 Load cell

1311


what is firing angle of phase controlled rectifier?

1090


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2622


how we calculate the short circuit capacity of the busbar in LV & HT?

1106


how to control dc motor?

1916


sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.

1955


y neutal is required for 3 phase. neutral carrys only current or voltage. in 3 phase circuits.

1939


why booster transformer is used in sumpners test conducted on transformer????

3582


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1498


Who is an adoptive entrepreneur?

5


how u choose thermowell lenght n pnumatic C/v size?

2109


how to Select Lighting arrester? What r the parameters to be considered for the selection of Lighting arrester ?

1739


Dry type transformers

1880


can you please give me the questions related to steels,i have an interview regarding to steels factory

1808


What in bending moment, if a moment is free end of cantilever beam?

1315