Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
TCS,
1100I have a mapping loading 100 records and it failed on 20th record. how to recover it without changing anything.(in prod where we don't have any access).. (the session should should start from 21 record)
1037
Describe the scenarios where we go for joiner transformation instead of source qualifier transformation?
How can a transformation be made reusable?
What is cubes?
What are the statements that are executed only?
How to generate sequence numbers using expression transformation?
What are pre and post-session shell commands?
What do the put and input function do?
What is intricate mapping?
Explain teradata utilities?
Nls stands for what in datastage?
Explain the various test procedures used to check whether the data is loaded in the backend, performance of the mapping, and quality of the data loaded in informatica?
what is enterprise guide? What is the use of it? : Sas programming
What is conduct>it?
Input Data: AAABBBCC CCAAABB expected output A3B3C2 A3B2C2 How can I achieve this in Ab initio? where In output count of occurrences should be sorted from high to low
what can you learn from the sas log when debugging? : Sas programming