What is meant by 'zero value' in quantity surveying.
Answers were Sorted based on User's Feedback
Answer / sathy
Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)
Is This Answer Correct ? | 91 Yes | 13 No |
Answer / bhanu prakash
Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.
Is This Answer Correct ? | 23 Yes | 9 No |
Answer / ilayaraja
Difference between BOQ cost and actual cost.
Is This Answer Correct ? | 14 Yes | 2 No |
Answer / bharath m,+91 8438238335/99806
Zero Value is the actual cost workings for entire project,prior to start the project.
Bharath M
+91 8438238335/9980644165
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / sudheer
Zero value is BOQ cost. It will be compared with actual or
executed cost. Which show the extra cost for for
construction.
Is This Answer Correct ? | 10 Yes | 9 No |
Answer / sameer kashmiri
The difference of initial estimated cost and final estimated cost or Actual cost should be zero or near to zero.... its called ZERO VALUE
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / balakrishnan
Zero Cost is the actual cost of each activity, in which Over heads & Profits are not included.
BOQ rate is the price which includes Over heads & Profits.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / irfan vadla
zero value is starting value which define certain calculation of quantity surveying
Is This Answer Correct ? | 2 Yes | 3 No |
how to calculate the load bearing capacity of slab hos thickness and steel are already given?
what is the status of Brick & cube testing
what is the allowable silt content in concrete?
Define relative co-ordinates?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
what is the construction cost for per cft of multistorryed building in kolkata?
how we can find sieve #4 is 4.75mm?
How is improve my knowledge in construction industries....
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
what are IS code for M20, 25, etc
40 Answers Aarvi Encon, Best Builders, L&T, NCC, PWD, RNS, Vardhman,
Whats maxi. slump of M-7.5 Concreit for PCC
2 Answers Indiabulls, Swastik Group,
What is themeaning of TBM in civil construction