What is meant by 'zero value' in quantity surveying.
Answer Posted / bhanu prakash
Zero Value in Quantity Surveying is value where we are
starting the work of Surveying. i.e . the initial position
or starting point of Survey.
Is This Answer Correct ? | 23 Yes | 9 No |
Post New Answer View All Answers
What is the difference between yeild strength and compressive strength of steel???
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
How to cal. The weight of hollow pipe?
What is the method of soil replacement test?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what is anchorage length,lap length and (dont remember the last one)
what is features of a typ-ical modern air-conditioning installation?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
What are some facts about concrete?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
How do you measure water flowing through 300mm diameter pipes?
What are the different approaches in designing the floors of the service reservoirs?
in design case of structural member best suitrable percentage of steel limit is what