What is meant by 'zero value' in quantity surveying.
Answer Posted / ilayaraja
Difference between BOQ cost and actual cost.
| Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
What is the meaning of a blue land surveyors flag?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
What is the crank length in the slab?
how much of the strength comes from post-production curing
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is the usage of zoom command?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What does a construction cost covers and what does not?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.