What is meant by 'zero value' in quantity surveying.
Answer Posted / k.prakashchandra
work yet to be taken up
Is This Answer Correct ? | 43 Yes | 16 No |
Post New Answer View All Answers
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How many lbs are there in a yard?
a butt weld is specified by
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
in 100 cft = 1350 bricks in 100 cft = ? bloks
what is a well
How much time Required for PPR pipe network testing
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I need old MMUP exam question and answer for Civil engineering
what is civil enginnering & what you need of this course?
How to compute minimum number of columns required for a site from area of site?
how to prepare site mix design
What is missing report and how to prepare
What is the difference between linear dimension and aligned dimension?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches