What is meant by 'zero value' in quantity surveying.

Answer Posted / k.prakashchandra

work yet to be taken up

Is This Answer Correct ?    43 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

1575


How many lbs are there in a yard?

679


a butt weld is specified by

2591


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2059


in 100 cft = 1350 bricks in 100 cft = ? bloks

2385






what is a well

1506


How much time Required for PPR pipe network testing

1694


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1712


I need old MMUP exam question and answer for Civil engineering

1159


what is civil enginnering & what you need of this course?

1797


How to compute minimum number of columns required for a site from area of site?

1537


how to prepare site mix design

1557


What is missing report and how to prepare

1026


What is the difference between linear dimension and aligned dimension?

635


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1222