Answer / kamlesh mahajan

Total station=1 sec. Theodolite= 20sec. Dumpy
level = 6 minute. Plane table is used for sighting
and drawing si multaneously.

Is This Answer Correct ?    12 Yes 4 No

What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table..

Answer / ravi kumar

total station : angle 1" , distance 1mm
theodolite : 20"
dumpy level : 5mm based on levelling staff used
plane table : 1 Dimentional

Is This Answer Correct ?    0 Yes 0 No

What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table..

Answer / vishal

Total station has from 1sec to 6sec.
Theodolite has from 6sec to 1min.
Dumpy Level has 6min and 5mm in height depends upon staff.
Plane table has 1D.

Is This Answer Correct ?    2 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

what is IS CODE in concrete tiles

4 Answers   L&T,


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

0 Answers  


is concealed wiring a problem in fly ash brick wall?

0 Answers   Earthstone Infra,


in which measurment pitot tube is used

6 Answers  


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

0 Answers   Bhel,






what are the types of dimensioning?

0 Answers   L&T,


Is Sugar a retardar or accelator or plasctizer?

5 Answers  


in the footings first which reinforcement bar has to be layed as per desi

1 Answers  


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

0 Answers  


define the engineering property of a soil. make a list of list property(properties)

2 Answers   AAI Airports Authority Of India,


Key is put at the time of casting 1st lift of column to get– –

1 Answers  


what is plum & mass concrete?

9 Answers   Shri Construction,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)