Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Water absorption for stone and first class stone bricks?

Answers were Sorted based on User's Feedback



Water absorption for stone and first class stone bricks?..

Answer / kumar

Absorption value of stone is less then .5% and for stone
bricks also same. Normal first class clay bricks water
absorption should not more than 20%. for Flyash bricks
water absorption is between 8 to 12%.

Is This Answer Correct ?    4 Yes 0 No

Water absorption for stone and first class stone bricks?..

Answer / ihtesham

GOOD QUALITY OF STONE CAN ABSORB WATER MAX UP T0 5% ONLY.
AND GOOD QUALITY OF BRICK CAN ABSORB WATER 15-20 %.By weight we can check.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between engineering stress and true stress?

0 Answers  


what is the meaning of sleeves in reinforced concrete????. where its coming???.

1 Answers  


What do you mean by Hydraulic Piling??

2 Answers  


how to test the quality of bars???

6 Answers  


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

0 Answers  


How many days should curing of plastering, brick work and concrete

0 Answers  


how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?

31 Answers   ABES Engineering College, Gammon, Jalanidhi, NCC,


qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm

6 Answers   APGenco,


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

0 Answers   DBM,


What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code

9 Answers   IP Infra Power,


how to calculate rate analysis for column shuttering

2 Answers   L&T, Marg,


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

0 Answers   NA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)