how sir calculate the slab steel and sir i want to know
that how i calculate shutter works payments in cum and the
rate is 120 per cum
Answer / venu gopal
Generally shuttering will calculate in SQm/SQft . First u have to know the Dimensions of the member (column/beam etc..) then calculate the area of the member ..that area multiplies with thichness wii gives u the Volume of shuttering
Is This Answer Correct ? | 2 Yes | 0 No |
In case of tunnels (Railway) what is the way of securing a wall beam?
what is the difference between volume and weight batching and which is better?
what is the grade of lean concrete?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the ideal size of the living room ranges from small to large size?
What is indicate Fe250 in steel structure?
how to calculate the loads on slab? what are the steps?
How do we test on design and style in a software?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
If the design mix of M-30 grade concrete is 1:1.5:2.8 (By Weight)& W/C ratio is 0.45, then what should be the volumetric mix for the same ?
Why did you choose this career?