what is the relation between seventh day strength & twenty
eighth day strength of cement concrete
Answers were Sorted based on User's Feedback
Answer / ravisobhan
7 days strngth is at 2/3rds of 28days stength. this is
required to check the concrete strength gaining in view of
removing formwork and to take preautionary measures incase
of failures before deshuttering.
Is This Answer Correct ? | 33 Yes | 0 No |
Answer / roby
For cement concrete the setting time is a dependent out put depending on type of cement..type & max dia of aggregates,admixtures..environmental conditions and al..inspite of all this IS:456-1984 suggest tat about 66.7%....but still it has to be performed in lab nd checked.......
Is This Answer Correct ? | 3 Yes | 4 No |
Answer / balaji
compressive strength of 28 days cube is more than the 7
days cube
Is This Answer Correct ? | 4 Yes | 8 No |
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
in the footings first which reinforcement bar has to be layed as per desi
Where do we use singly and doubly reinforced beam in construction purposes
2 Answers Isha Homes, Simplex, Sterling Wilson,
shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.
difference between high rise & multistoried building?
what are the advantages and disadvantages of using bentonite slurry in bored cast in situ piles, both in terms of design and execution point of view.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
How to calculate stirrups cutting length in columns
How do I calculate the ground is resested for a 5 floor building?
What is hybrid foundation?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
In reclamation works what are the importance of geotextiles and sand?