Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Leastcount of
1. Total station
2. Theodolite
3. Dumpy level
4. Plane Table

Answer Posted / vishal

Total station has from 1sec to 6sec.
Theodolite has from 6sec to 1min.
Dumpy Level has 6min and 5mm in height depends upon staff.
Plane table has 1D.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How did street originate in the plumbing term street ell?

1032


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2360


who to find building iron rod strenth

2185


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2109


Why concrete barriers have curved surface profiles?

1376


Detection of a beam & a girder are––––

2232


Why is the statue of liberty made of copper?

1120


how much cost of single coat 20mm thick plastering per sqre meter

1639


What is the sugested procedure of water purification for public supply?

2306


why we are using stub column..? is it possible to construct steel stub column..?

2014


What are the advantages of building a dam on the river nile?

1137


what are the Task work of different labour.?

2641


what is the types of door's wood?

2100


what is labour consume factor in residential projects

2382


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

2376