Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Please tell me how to calculate the stiruup length for
rectangular and circular coloumns

Answers were Sorted based on User's Feedback



Please tell me how to calculate the stiruup length for rectangular and circular coloumns..

Answer / sobhanbabu

for rectangular column:let us the size of beam is 230x450mm
clear cover for beam =25mm
length of the stirrup on width side=230-2xcovers
length of the stirrup on depth side=450-2xcovers
hook length=10d(d=dia of bar)
so total length=(2(230-2x25))+(2(450-2x25))+2x10xd
for circular:let us dia of column is 300mm
cover=25mm
dia of stirrup=300-2x25=250mm
length of stirrup=3.14(pi)x250+2x10d

Is This Answer Correct ?    21 Yes 2 No

Please tell me how to calculate the stiruup length for rectangular and circular coloumns..

Answer / suresh

suppose the size of the coloumn is 300*400. end and side
cover is 40.
therefore a=300-40=260
b=400-40=360


therefore L=a+b+9(dia of the bar)
=260+360+9(12)=728mm

Is This Answer Correct ?    9 Yes 25 No

Post New Answer

More Civil Engineering Interview Questions

which is the period is known as golden period in ancient india?

1 Answers   RRB,


during earth quake base shear force=a/w*g Comment?

2 Answers   Power Grid,


Grades of concrete

28 Answers   Mittal Steel, UNOPS,


What is the Maximum %age of Steel in columns and beams ?

0 Answers  


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

0 Answers   IOCL,


How much shuttering oil required for per m2 shuttering by 12mm ply

3 Answers  


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

16 Answers   Reliance, Siddhi Constructions,


What is a Quick Sand?

3 Answers  


Why did you choose to communicate with our organization ?

0 Answers   AK,


How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?

35 Answers   Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,


what is the painting co efficient of slope roof tiles?

0 Answers  


how must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.

17 Answers   CCCL, Gulf Construction, KITECH, L&T, Mars Planning Engineering Services, NHAI, Simplex, Supertech, Yamaha,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)