What should be the maximum allowable time for placing ready
mix concrete? The specification requires concrete placement
within 90 minutes of batching at the plant. What is the
significance of this 90 minutes & should this be used as a
rejection criterion? What effects does the concrete has
after that time period?
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate the quantity of material in 1 cubic meter Concrete?
What is Purpose Difference in Stirrups For Beam & Column ?
how many no of solid blocks and bricks required for construction of wall for 100 sqft?
whch is the grade of OPC
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
Why we use pcc in foundation?
how we can design the design mix(m25)
what is the use of beam end forces while using a staad ? wha they are show
What is the difference between stress and strength?
why we can use dust in concrete insted of fly ash
in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?