Answer / ademola
assuming you want to calculate for a 225 x 225mm column, you are to add the length of the column to the breadth (225+225=450), after that you will deduct the concrete cover which is (4*25=100),=450-100=350. after that you will multiply it by two (350*2=700), after that you will add the hook ( in this section people usually use 50,but to be on the safe side it is better to use 75), (2*75=150), the add it to the 700 that you got initially, (700+150=850). That is for the length of each stirrups.
Is This Answer Correct ? | 0 Yes | 0 No |
Differenciate between One way slab and two way slab
how to find out hard strata in bored pile when the DMC method adopted.
what does gabion mattress means in stone pitching works
Calculation of Pier Cap with tapper area?
Explain what is change order request?
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
how much cement is required for 3200 sq ft of roof
convert 1cum how many kilo
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Why we stop the concrete in 1/3 rd of span length
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
how much wall area covered by 1 kg of lapi(putty)