Answer / nkn

These are the terms used in contracts, EPC - Engineering ,
Procurement , Construction; BOOT- build Own Operate
Transfer; DBOOT - Design Build Own Operate Transfer.

Is This Answer Correct ?    22 Yes 3 No

What is the difference between EPC,DBOOT and BOOT...

Answer / surya v kuchibhotla

In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.

Is This Answer Correct ?    15 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is the difference between mortar and concrete???

3 Answers   Indiabulls,


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

0 Answers  


How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?

1 Answers   CCCL,


The slenderness ratio of a column is zero when its length ??

2 Answers   SSC,


What is the tallest man made structure in the world?

0 Answers  






What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

0 Answers  


"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

0 Answers  


How to calculate steel for a wall foundation form drwaing

1 Answers   Ircon,


12 mm dia not available at site for raft, 10 mm are available at site how to calculate?

8 Answers  


What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?

1 Answers  


what is CBR Test

10 Answers   HPCL,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)