How much quantity of rod binding work by a rod binder per day
No Answer is Posted For this Question
Be the First to Post Answer
what is the 0 value in quantity surveying
how does I measure the unit weight of steel?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is pouring and explain
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
What is rate of concrete surface rendering work per sqm
U are a civil engineering student?why do u want to enter into IT industry
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none
Which stone is best for wall construction Laterite Stone or Cement Blocks