Volume of Dry Mortar = 35% of volume of Brickwork

Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.

Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags

Sand required = 5/6 X 1.35 = 1.125 cu.m.

Bricks required = 500 Nos.

Is This Answer Correct ?    10 Yes 43 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate the thickness of the rcc slab?ll u pls tell the formula?

2 Answers  


How many steel is require in one sqft area?

17 Answers   L&T, XYZ,


HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

0 Answers  


I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,

0 Answers  


Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

0 Answers   Sail,






what is the difference between volume and weight batching and which is better?

2 Answers   ECCI,


What is the Maximum %age of Steel in columns and beams ?

0 Answers  


what is the types of surveying?which type of survey carrying for type of work?

1 Answers  


why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?

5 Answers   L&T,


what is the permissible safe bearing capacity of soil?

7 Answers   Indian Railways,


I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.

0 Answers  


Mention different types of roof systems?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)