How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answers were Sorted based on User's Feedback
Answer / zuber ahmed
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.
Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags
Sand required = 5/6 X 1.35 = 1.125 cu.m.
Bricks required = 500 Nos.
Is This Answer Correct ? | 10 Yes | 43 No |
How to calculate the thickness of the rcc slab?ll u pls tell the formula?
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
what is the difference between volume and weight batching and which is better?
What is the Maximum %age of Steel in columns and beams ?
what is the types of surveying?which type of survey carrying for type of work?
why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
what is the permissible safe bearing capacity of soil?
I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.
Mention different types of roof systems?