How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step

Answer Posted / zuber ahmed

Volume of Dry Mortar = 35% of volume of Brickwork

Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.

Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags

Sand required = 5/6 X 1.35 = 1.125 cu.m.

Bricks required = 500 Nos.

Is This Answer Correct ?    10 Yes 43 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1481


What is the distance between railway tracks?

705


how to identify the failure of building by expansive soils

1242


What is different between DI Pipe and CI pipe?

1593


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1828






What are the advantages of building a dam on the river nile?

656


Define What does civil status mean?

763


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2273


What is thumb rule in quantity and cost estimation of a residential building?

2658


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

1482


Why reinforcement done in shorter span in two way slabs

1389


How to plan a project

1731


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1851


What is the method of soil replacement test?

1555


What is quantity of cement and sand required for 2000sqft of tiling?

2409