binding wire requirement in rcc structures

Answers were Sorted based on User's Feedback



binding wire requirement in rcc structures..

Answer / thangam

10 Kgs Binding Wire per 1MT of Steel.

Is This Answer Correct ?    7 Yes 1 No

binding wire requirement in rcc structures..

Answer / santosh singh

about 9 to 13 kg of binding wire is required per ton of
steel

Is This Answer Correct ?    10 Yes 6 No

binding wire requirement in rcc structures..

Answer / saalim

1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.

Is This Answer Correct ?    6 Yes 2 No

binding wire requirement in rcc structures..

Answer / linu t mathew

1% of steel weight

Is This Answer Correct ?    4 Yes 2 No

binding wire requirement in rcc structures..

Answer / valmik joshi

7 to 8 kgs per 1 MT work of steel

Is This Answer Correct ?    0 Yes 0 No

binding wire requirement in rcc structures..

Answer / manikanta73

for sufficient bond

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

mix design procedure for 1:6 cement mortar

0 Answers  


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

0 Answers  


what is mean of buld density

1 Answers   HPCL, NOW,


1:4:8 pcc calculation 591 cu.ft

0 Answers  


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

0 Answers   RS Construction,






What is the ratio of cement, sand, aggregate of mix M25

20 Answers   CCCL, Sarvottam Cement,


What is Curtailing of R/F

0 Answers  


Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned

3 Answers   Bestech,


Column is a compression member then why we provide reinforcement on column?

1 Answers   Simplex, Thermax, Vihaan Group,


Explain how you can turn off the display for dimension in CAD?

0 Answers  


what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.

4 Answers   Al Futtaim Carillion, NTPC,


how many covering can be taken in the beam,column & slab also stair-case?

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)