binding wire requirement in rcc structures
Answers were Sorted based on User's Feedback
Answer / santosh singh
about 9 to 13 kg of binding wire is required per ton of
steel
Is This Answer Correct ? | 10 Yes | 6 No |
Answer / saalim
1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.
Is This Answer Correct ? | 6 Yes | 2 No |
mix design procedure for 1:6 cement mortar
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is mean of buld density
1:4:8 pcc calculation 591 cu.ft
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What is the ratio of cement, sand, aggregate of mix M25
20 Answers CCCL, Sarvottam Cement,
What is Curtailing of R/F
Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned
Column is a compression member then why we provide reinforcement on column?
1 Answers Simplex, Thermax, Vihaan Group,
Explain how you can turn off the display for dimension in CAD?
what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.
4 Answers Al Futtaim Carillion, NTPC,
how many covering can be taken in the beam,column & slab also stair-case?