binding wire requirement in rcc structures
Answers were Sorted based on User's Feedback
Answer / santosh singh
about 9 to 13 kg of binding wire is required per ton of
steel
| Is This Answer Correct ? | 10 Yes | 6 No |
Answer / saalim
1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.
| Is This Answer Correct ? | 6 Yes | 2 No |
the volume of 50kg bag is 27 lit 24.7 lit 44.7 lit 42.9 lit
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is SDLC ?and write a 'c'program for to swapping the three numbers?
how to workable concrete cube test M-25 design mix
2. What are the grades of steel used in the concrete design?
what is Bearing Capacity,How to determine it?
2. What are the advantages of your present job, things you like about it?
what type of waterproofing and procedure using in building?
What is the largest concrete dam in the world?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
1) what is the use of pin and plate vibrators during slab casting? 2) how much cement bags are required for 1sqm 4inch brick wall? 3) Is it viable to provide overlap at column , beam & slab junction. if no why? 4) if bar dia is changing in column reinforcement , which dia bars overlap is considered? 5) what is isolated and ecentric footing?
Tell me about triple point of water.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)