binding wire requirement in rcc structures

Answer Posted / thangam

10 Kgs Binding Wire per 1MT of Steel.

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When column of building is abutting the boundary line,then suitable footing advised is

1954


What is the difference between chamfer and fillet?

796


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

1920


what is the meaning of 40/20 src

5761


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1109






Minimum and maximum size of the building components

1769


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

666


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1152


how many tonnes equals to one cubic feet?

1191


why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..

2085


difference between fc and fc'?

1312


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2180


how to calculate spacing rod in column

1434


What are the different theories of failure under static load?

727


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3346