binding wire requirement in rcc structures

Answer Posted / santosh singh

about 9 to 13 kg of binding wire is required per ton of
steel

Is This Answer Correct ?    10 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1238


How can you produce desired alloys and discuss their applications in daily life.

674


Explain the difference between slab and beam?

665


What do you mean by the word 'shear'?

1842


Explain what is structural frames or systems?

657






Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

1781


What is the name of this multiplication factors ?

1710


A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?

770


plz.show development and anchorage length in simple diagram.

2101


How we calculate the service time of buildings

1428


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2596


Define relative co-ordinates?

694


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3331


why we are using stub column..? is it possible to construct steel stub column..?

1520


What is bmc stands for in bmc software?

669