binding wire requirement in rcc structures

Answer Posted / valmik joshi

7 to 8 kgs per 1 MT work of steel

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1577


What is the cemnent ratio

1825


Special thing in designing a overhead reservoir ? which is different from an ordinary design

758


How can explode a block?

682


What are the benefits of rcc pipes over steel designed pipes?

785






I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

1920


what is Brest Wall?

822


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1694


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1595


how to estimate material requirement for an area of house in square feet?

1738


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1752


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1261


Please let me know what is the simplest way of Calculating Mix Designs

1517


What Reinforcements Are Used In The Process Of Prestressing?

839


what is shuttering co efficient?

1302