please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
| Is This Answer Correct ? | 2 Yes | 0 No |
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
how many area req.in 15000liter water tank
Is there any codal provision for the use of Micro Silica in concrete?
bulkege of concrete for design mix concrete for grade m30
what do you mean by punching shear?
state and explain in Water absorption of brick
How do you maintain water pressure?
what isload waring calculation
what is preposition of M-5 grade
3 Answers Montag Infrastructure,
what is rebaring?
what is bond strength of concrete
DESIGN PROCEDURE OF THE COLUMNS
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)