bulkege of concrete for design mix concrete for grade m30
Answers were Sorted based on User's Feedback
Answer / sjtbehera
i do not understand your qustion.As much we know about
bulkage of sand, bulkage of aggregate, ok bulkage of
concrete may be happen due to entrapped air in concrete.
| Is This Answer Correct ? | 1 Yes | 1 No |
granite tiles laying 60/sq ft.how to convert in sq mt,what is the mltiplying value.
For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement
what is meant by structural design?
What is the result of cube in 7 days test ?
3 Answers Casa Grande, Heer Enterprises, Him Shikhar Construction,
How to construct a water sump in a rocky soil?
which formula used for calculate the area of segmental arch?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how many types of foundation
What is the effect of a building collapse?
if 20mm & 10mm coarse aggregate we have consider same prapotion than how to analysis m25 concrete
In pile foundation which kind of action are take place?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)