please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer Posted / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is mc arther pile?
PL.tell me about civil engineering questions with answer
States some of the commonly used commands in cad software’s?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
Detection of a beam & a girder are––––
What is geopolymer based concrete?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
how to calculate reinforcment in staircase cranked beam?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
How many pyramid in egypt?