please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer

Answer Posted / dilip wasudeo jadhao

Site Engineer-supervising to the worker working on site and
guide them for proper execution.

Quantity surveyor- Estimate the quantity of the work under
execution.

Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.

Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do you calaculate the total steel quantity of an rcc building using thumb rule?

3199


what is mc arther pile?

1777


PL.tell me about civil engineering questions with answer

2118


States some of the commonly used commands in cad software’s?

764


What is the yield of 100 litres of water and 10 kg of cement in grout mix?

1579






How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

1444


Detection of a beam & a girder are––––

1781


What is geopolymer based concrete?

2150


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1754


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

1903


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2028


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

1462


how to calculate reinforcment in staircase cranked beam?

2185


Under what circumstances should pot bearings be used instead of elastomeric bearings?

715


How many pyramid in egypt?

635