Answer Posted / satish ramnath pekhale
Shuttering is formwork which is used to shape up footing, column, beam , slab as per there given shape and sizes. While centering is process of marking center over actual site as per drawing
Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
what is the difference between np2 and np3 concrete mix
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
What is the force exerted by the tacoma narrows bridge?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Does brick grows bigger every year?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
For fine aggregate which is most suitable River sand or crusher sand & why ?
Are you ready to relocate with your immediate family to United States as a new employee?
What are the ingredients of pre-stressed concrete?
dialation means
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how to determine H- zone in a column? where it will occur?
What are the techniques to measure road difference?