Answer Posted / arjun ariyan
Shuttering is the base support for the structure. Centering is Support for the base support :)
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What is the Hardness of M-40 grade concrete, general and theoratical
How to calculate laplength for 3 floors
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
what is difference between fluidity and workability also how palsticizer works
What are the applications of modulus of elasticity?
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What ingredients with% found in ppc cement??
rate analysis for cement pointing 1:4 , for 100 sq m
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
why does the most of civil engg is not intersted to going for teaching field?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
what pressure the NP2 class RCC pipe can sustain?
five requirements of infill panels for walls?