How much percent dry volume consider for concrete
Answer Posted / dinesh koli
54% dry volume consider for concrete
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
How to take labor charges for construction of 1cum of concrete?
States some of the tool bars used in cad?
cement and sand required for one block of size 0.23*0.15*0.46
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is the difference between Hinged and pinned in Column ends
How many mortar required for Brickwork of 1 Cu.m works??
I have an span length 16 ft c/c
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
Explain the different types of building contracts?
Which is the latest version of solidsworks?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
How to decide/consider the grade of bitumen for dbm.