How much percent dry volume consider for concrete
Answer Posted / bharath m/8438238335
For 1m3 wet volume concrete,1.57 m3 or 157% dry volume required if mix using 20 mm metal.
and 1.52 m3 or 152% dry volume required if mix using 40 mm metal.
This is based on Experimental Investigations arrived.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
five requirements of infill panels for walls?
How is calculate the cube molt
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Specific gravity of cement?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
How to estabilish reinforcement Steel rolling margin for a building projects ?
Define What is the tallest man made structure in the world?
what is c4x light weight cement blocks
How much does the leaning tower of pisa lean?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
Explain the mechanism of cavitations in pipes and drains?
why development length = 50D . why not 100D
How to get MEP technical,instaaltion & testing data for interview?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?