Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What do you mean by Hydraulic Piling??

Answers were Sorted based on User's Feedback



What do you mean by Hydraulic Piling??..

Answer / shetkar

Piling done by MAIT machine which operates on hydraulic oil

Conventional method is done by tripod machine without hydraulic oil

Is This Answer Correct ?    0 Yes 0 No

What do you mean by Hydraulic Piling??..

Answer / guest

piling done by means of hydraulic

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between Fe 500, Fe 500 D and Fe 515.

0 Answers   Pioneer,


cement and sand required for one block of size 0.23*0.15*0.46

0 Answers   EJOM,


How to correct a column which don't have sufficient cover?

1 Answers   Leighton,


for mortar 1:18 how much cement and sand required for 1 CM

1 Answers  


why hanger rods are used in beam

3 Answers  


How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument

0 Answers   L&T, R R Thulasi Builders,


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

0 Answers  


1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?

1 Answers   L&T,


What is the difference between Design and nominal mix?

2 Answers   HHH,


which is cover of r.c.c. column,beam and slab

5 Answers   Cube, RPP,


A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?

1 Answers  


Is there any course for billing available in Mumbai? If yes then please mail me the details..

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)