Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Concrete Mix designs for M15,M20,M25,M30 and M35

Answers were Sorted based on User's Feedback



Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / bhai

for M15 1:2:4
M20 1:1.5:3
M25 1:1:2
M30 depend on design mix
M35 depend on design mix

Is This Answer Correct ?    574 Yes 86 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / sadam

m-15 1:2:4,m-20 1:1.5:3

Is This Answer Correct ?    362 Yes 68 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / shafique

M15 1:2:4
M20 1:1.5:3
M25 1:1:2
M30 depend on design mix
M35 depend on design mix

Is This Answer Correct ?    234 Yes 50 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / ibrahim s

Mix design ratio is depending on the trail mixes conducted
to get the particular design strength of concrete in 28
days.It may varry depending on material, weather condition,
batching etc.

Is This Answer Correct ?    140 Yes 23 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / balaji

1:2:4 for m15, 1:1.5:3 for m20, 1:1:2 for m25, for m30,m35 depends on the design mix

Is This Answer Correct ?    120 Yes 21 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / s.prabhu

in design mix we cannot say any propertions are fixed it is
depends upon the trails made But what ever mr.Bhai is
suitable for volumetric but not for design mix, Mr. bhai
please get updated

Is This Answer Correct ?    107 Yes 29 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / prabu

m15-1;2;4,m20-1;1.5;3,m25-1;1;2,m-30,m35- depends on the mix

Is This Answer Correct ?    93 Yes 16 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / jebus dura. m.e.,civil

M 15 =1:2:4(ONE CEMENT,TWO SAND AND FOUR 20mm HBM JELLY)
M 20 =1:1.5:3 ratio
M 25 = 1:1:2
M 30 = 1:1:1
OTHERS DEPENDING UPON STEELS

Is This Answer Correct ?    89 Yes 24 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / mohommud raffique

m15 1:2:4 m20 1:1.5:3 m25 1:1:2 m30 m35 its propotionality is not fix it is depend on trial basis

Is This Answer Correct ?    51 Yes 9 No

Concrete Mix designs for M15,M20,M25,M30 and M35..

Answer / sanjay

yes

Is This Answer Correct ?    60 Yes 21 No

Post New Answer

More Civil Engineering Interview Questions

how much quantity of mortar required for cement pointing work?

0 Answers   City Corporation, Pragya Construction, Simplex,


I have an span length 16 ft c/c

0 Answers  


what are the CAD software versions you have used?

12 Answers   ERA, IES,


who to calculate the bar bending schedule?

3 Answers   APPSC,


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

0 Answers   Bechtel,


As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came

1 Answers   L&T,


Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?

1 Answers   IBA,


how to calculate the weight of 6mm dia rod

7 Answers   Bharat Construction, Sripathi Construction,


what is the slump of pile concreting work? give me the value of minimum and maximum value of slump and how give slump in pile?

3 Answers  


cement mortar1:5 12mm thick and one bags cement how much area pleastering please give anwser

12 Answers   DeSigns Inc, L&T, Marg, Sand, Vee Technologies,


What us meant by DLP & liquidated damages in civil quantity surveying

1 Answers  


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)